Manufacturing and installing the steel-structured bridge of type B6; M6 / 142k

We performed the manufacturing and on-site installation of the overpass of Érd over the Angeli road consisting of a 183,5-tonne steel-structured bridge.
Tasks of the Gyárépszer Zrt:


- technology issues,
- coordinating the construction,
- performing the manufacturing and on-site welding works,
- qualifying and documenting the performed works.


Client: Mahíd Zrt.

 

Jump to gallery

Visitors

516711
Today
Yesterday
This Week
This Month
All days
14
237
605
2362
516711