Paper industry installation

 - Upgrading the PM9 paper machine, Dunaújváros

Ordered by the Voith AG: full replacement of the Speed Sizer with the infra drier in April and May of 2006.

Manufacturing and on-site installation of Reel pulper ordered by the Finnish Vaahto company.

Dismounting and installing the Masterreel machine managed by Finnish experts and ordered by the Vaahto company.

Manufacturing and on-site installation of air-technical steel-structures ordered by the Spanish Brunnschweiller company.

 

 - Upgrading the PM 8 paper machine, Szolnok (September - October, 2006)
Mondy Business Paper Hungary zRt. Full reconstruction of air-technical equipment, heat-using heat exchanger and the paper machine - Hood.

 

 - Upgrading the PM 3 DUNAPACK paper machine, reengineering the drives August, 2008

 

 - Hamburger Hungary, PM7 paper factory machine installation between September, 2008 and May, 2009

Ordered and organised by Kresta GmbH: machine mounting and installation: material preparation, compacter, multiscreens, centrifugal cleaners, paper bale conveyor belt, paper machine, drying section, drying section with air-technical steel structure.

 